In a recall, every hour counts. SCIS links every raw-material lot to batch and customer and shows what's affected at a click — days become minutes, and audit prep a matter of hours.
When a quality issue hits, speed decides. Hunting batches through folders and scattered spreadsheets costs days — exactly the time the legal deadlines don't allow. And the next audit raises the same coverage question all over again.
Traceability as part of daily operations — not a separate document archive that doesn't hold up when it matters.
Every raw-material lot linked to batch and customer — backward to the supplier, forward to the recipient.
For a suspect lot, instantly every affected batch, product and customer — in minutes, not days.
Recipes and consumption per finished product as the basis for end-to-end traceability.
A batch cannot be completed before its consumption is covered by the BOM — no gaps.
Consumption and batches are captured right in production, not reconstructed later at a desk.
Audit- and authority-ready traceability records at the click of a button — for IFS, BRC and the real thing.
Batch traceability (lot/batch genealogy) links every raw-material lot to the batches produced from it and the customers supplied. You can follow it both ways: which supplier lot a batch came from (backward) and which customers received a given lot (forward).
Instead of digging through folders and spreadsheets for days, one-click recall instantly shows every affected batch, finished product and customer for a suspect raw-material lot. Days become minutes — the prerequisite for meeting the short legal deadlines.
EU Regulation (EC) No 178/2002 requires traceability "one step back, one step forward". SCIS documents these links end-to-end and produces them as an audit-ready dossier — for authorities as well as IFS/BRC audits.
A production batch cannot be completed while its consumption is not covered by the bill of materials. Declaration happens right on the shop floor, so there are no gaps in the genealogy you would have to rely on in an emergency.
No. Capture runs through a simple declaration on the production floor and builds on your existing bills of materials. SCIS is live in weeks — no months-long rollout.
In a short demo we show batch genealogy and one-click recall on your own products.